Thursday, December 1, 2016

SDKFZ 234/2 Work in progress

So having shared the previous photographs, I received feedback on the stowage.

Having discussed the stowage arrangement, I have removed the supplied box and will add a balancing fuel drum on the right hand rear mudguard.


The fixing slots in the hull will need to be filled with Milliput and the drum will be then be fixed on top. Additional soft stowage will fill the gap between the drum and the spade.